AGA TCDCNGMBRG Guía de instalación Pagina 25

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 32
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 24
Fig. 16 DESN 517047
SPARK
GENERATOR
TERMINAL
BLOCK
25
Access to the gas governor is as follows:-
a) Remove pan supports and all control knobs.
b) Remove four chrome buttons and the four plate retaining screws (2 each side).
c) Remove left hand and centre grommets from the control panel to gain access to the fixing screws. Remove two
screws from control panel (one from left hand hole and one from centre hole). (See Fig. 8).
d) Pull top plate forwards slightly and lift up at front. Support top plate and disconnect wiring to the two neons. Remove top
plate.
e) Lay the top plate on its top face, suitably protected.
GAS ADJUSTMENT FOR
NATURAL GAS/PROPANE
Vista de pagina 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 31 32

Comentarios a estos manuales

Sin comentarios